Ren Álvarez writes nine technicians across the top of a planning sheet. "Nine people times forty hours. We can sell 360 hours of work." It is a sensible place to start when the payroll contains nine names. It is not the number of hours she can sell.
Ren is an illustrative owner, not a client case study. She runs nine trucks with two dedicated install crews. Her recurring June story paired 94 inquiries with nine idle crew-days. A large workforce had not made the acquisition report and the schedule agree.
At this size, a single capacity total conceals too much. People belong to particular assignments. Install work consumes crew-days. Service work consumes appointment time. The office has to handle the demand for both.
Ren needs a plan that reaches a usable opening and then follows the cost of filling it.
How many people are actually available to each line of work?
Start with names and assignments, not truck count. Decide whether the crew headcount is included in your technician total. Count each person once.
For this separate planning model, assume four of nine technicians form two dedicated two-person install crews. Five technicians remain in service. These crew sizes and allocations are assumptions for the exercise, not additional canonical facts about Ren's actual staffing.
At forty paid hours each, the total is 360 gross person-hours: 200 service hours and 160 install person-hours. It is not nine service technicians plus four more installers. That mistake would invent 160 hours before the subtraction even began.
List restrictions beside each name. A trainee, a specialist, an employee on leave, and a technician qualified to lead a complex installation are not interchangeable units.
The BLS description of HVAC work distinguishes installation, maintenance, repair, and areas of specialization. It does not supply a universal usable-hours ratio for your company. Use your own assignment and time records.
The true weekly capacity calculation provides the subtraction method. At a larger shop, add explicit team allocation so the same employee does not appear on two boards at once.
Ren's 360 survives as a payroll ceiling. The correction begins when she writes five service names in one column and four install names in the other.
What can those people reliably put on the board?
Keep the next figures explicitly modeled. Replace them with observed durations and constraints before using them to accept work.
The five service technicians provide 200 gross hours. Assume seventy-five hours total for driving, preparation, parts, documentation, training, and other unavailable time. Leave another twenty-five hours for uncertainty and urgent work, without counting the same obligation in both categories.
That leaves 100 hours for planned service appointments. At an assumed two hours per appointment, including the job time covered by that slot, the board can accept fifty appointments. Travel has already been deducted, so it is not deducted again from each appointment.
For installation, two crews over five days provide ten gross crew-days. Assume two crew-days unavailable or held in reserve. Eight usable crew-days support four projects if each requires two crew-days from one two-person crew.
| Modeled weekly line | Gross availability | Usable planned work |
|---|---|---|
| Service, five people | 200 person-hours | 100 hours, or 50 two-hour appointments |
| Install, two crews of two | 10 crew-days | 8 crew-days, or 4 two-crew-day projects |
Do not add fifty appointments and eight crew-days and call the result capacity. Do not transfer an install opening to service unless the named people, skills, equipment, and promises actually allow the transfer.
Use service and install planning to keep those decisions separate.
Ren now has two deliverable limits. Neither is 360 hours for sale. The board is smaller than the payroll total because the work surrounding a job is still work.
Which of those slots still need demand?
Subtract existing commitments, including agreement visits and probable work already moving through the pipeline. Demand planning begins with the openings that remain, not the entire workforce.
Assume thirty-six service appointments are already committed against the fifty-slot limit. That leaves fourteen. Assume three install projects are committed against the four-project limit. That leaves one two-crew-day project opening.
Now give the acquisition forecast a booking denominator. If a comparable eligible service-inquiry cohort books at an assumed 70%, fourteen additional bookings require 14 ÷ 0.70 = twenty eligible inquiries. At an assumed 20% eligible-inquiry-to-booked-project rate, one install booking requires five eligible install inquiries.
These are planning expectations, not guaranteed outcomes or industry rates. Define an eligible inquiry and preserve the same definition when evaluating the test.
Put dates on the two assignments. Service inquiries may support near-term appointments; replacement inquiries need time for assessment, proposals, and decisions. The five install inquiries must enter early enough to support the target delivery window. They cannot be purchased on Friday as a reliable fix for Monday's empty crew.
Use install proposal follow-up to inspect work already under consideration before buying another five requests. A proposal viewed is still not a committed project.
Ren can ask marketing for twenty service and five install opportunities against defined windows. She can also see when the install answer belongs in the existing pipeline instead of a new campaign.
What can the acquisition plan contribute after its cost?
Use a separate cost model for those additional bookings. It is not Ren's approximately $18,000 monthly profile budget, and it is not the recurring eighty-lead financial example.
Assume media costs of $90 per eligible service inquiry and $250 per eligible install inquiry. Twenty service inquiries cost $1,800; five install inquiries cost $1,250. Media totals $3,050. Add $950 of allocated support for this acquisition test: $4,000 total. These input prices are assumptions, not current market quotes.
The fourteen service bookings and one install booking are not completed jobs yet. At a modeled 90% completion rate for each, expected completions are 12.6 service jobs and 0.9 installs. Fractional results express an expectation across repeated comparable cohorts; an actual completed-job report contains whole jobs.
Assume each completed service job leaves $300 after direct delivery costs, and each install leaves $4,000. Expected contribution before marketing is:
- Service: 12.6 × $300 = $3,780.
- Install: 0.9 × $4,000 = $3,600.
- Combined: $7,380 less $4,000 acquisition cost = $3,380.
That $3,380 remains toward fixed overhead and profit. It is not net profit, collected cash, or a promised return. Do not subtract direct delivery costs again after using contribution figures.
The SBA's finance guidance supports categorizing costs and comparing costs with benefits over a defined period. The assumed HVAC rates and outcomes here are the model, not an SBA benchmark.
Use budget allocation to decide whether that expected contribution, cash requirement, and uncertainty justify the test.
Ren has reached a number the agency slide alone could not supply. Four thousand dollars buys an uncertain plan to fill specific openings, not permission to spend until the month ends.
What would make the plan fail even if the arithmetic passes?
Start with job duration. If service appointments require two and a half hours instead of two, the same 100 planned hours support forty appointments. With thirty-six committed, the gap is four, not fourteen. The original demand order would be too large.
Next inspect conversion. If the service booking rate is 50% rather than 70%, twenty eligible inquiries produce ten expected bookings, not fourteen. If install inquiries take longer to decide, an acceptable eventual booking rate can still miss the delivery window.
Completion also changes the contribution. A cancellation can release time too late to refill. Do not assume every non-completed booking immediately becomes an opening another customer can use.
Check office capacity, geographic fit, parts, equipment, and supervisory coverage. Moving people between departments changes both original limits. A crew-day is only available when the whole required crew and the rest of the job are ready.
Keep future replacement value from service inquiries separate. If a service customer later buys an install, link the records and count the final job's contribution once. Do not add a speculative replacement amount to the service model and then count the full install again.
The call tracking and attribution process preserves those relationships. It cannot make an uncertain estimate certain.
Ren's operating review should challenge the assumptions most likely to change the decision. A correct multiplication with the wrong duration still sends the wrong work to the board.
Which numbers should Ren approve together?
Approve the staffing assignments, usable limits, existing commitments, target windows, inquiry requirement, cost scope, and contribution assumptions together. Give each uncertain input an owner and a date for replacement with observed evidence.
Keep the actual results on the same basis. The service and install operating report can show dated capacity alongside completed-work economics without turning one into the other.
Agree when to limit acquisition. A nearly filled service window, an unavailable crew, or an overloaded intake team can change the plan before the spending ceiling has been reached. Agree when to investigate weak results too, rather than automatically ordering more volume.
Nine people are a staffing count. The openings left after their assignments are the marketing assignment.
In Ren's illustrative review, 360 is still at the top of the sheet. Under it sit fifty service appointments, four install projects, and the commitments already made against both.
Her two screens can finally describe the same workforce. The next dollar has a dated opening to fill and a contribution assumption to defend.